10 Mile Road Crush and Shape

FTCH provided full construction engineering services to rehabilitate 0.92 miles of 10 Mile Road in the City of Farmington Hills. This $1.55-million MDOT Local Agency project consisted of hot mix asphalt crush and shape, and resurfacing, drainage improvements, concrete curb and gutter, sidewalk and ADA ramp construction, and traffic signal upgrades from Farmington Road to Orchard Lake Road.